Berg supplied and installed an outdoor refrigeration system to cool exothermic process at a polyethylene production facility. Scope of supply included two PIP RESR001 compliant air cooled outdoor chiller packages for hazardous environments mounted on a pre-engineered mezzanine structure, installation, start-up and training.